Home
Home
login
calendarsearchsitemaplost passwordregister
ABOUTACTIVITIESEVENTSINTERNATIONALPUBLICATIONS & PRESSPUBLIC CONSULTATIONS
 
ENERGY CUSTOMERSSURVEYS
 
 
 
 
   OPEN PUBLIC CONSULTATIONS
   CLOSED PUBLIC CONSULTATIONS
     CUSTOMERS
     ELECTRICITY
     GAS
       Investment Procedures for Gas Infras.
       Gas Target Model
       Gas target model - call for evid.
       FG on gas balancing
       CAM & CMP efft. storage access
       Gas Transparency
       Pilot FG Gas CAM / CMP
       10-year gas network dev. plan
       ERGEG Principles: CAM & CMP
       Article 22 - Exemptions to TPA
       GGPLNG
       Principles gas tariff calculation
       Gas Transparency Monitoring
       Capacity Calculation
       GRI Convergence
       Secondary Markets
       GGP Open Season
       Transmission Pricing
       GGP Balancing 2006
       Monitoring GGPSSO
       Roadmap to competitive mkts.
       GGP Balancing 2005
       GGP Storage System Operators
     CROSS-SECTORAL
E09-PC-46: Draft Pilot Framework Guideline on Capacity Allocation on European Gas Transmission Networks   
ERGEG Public Consultation: 2009/12/18-2010/02/26

 

ERGEG Workshop :  2  February 2010 from 10:30 to 16:30 hours
Renaissance Brussels Hotel 
located at:  rue du Parnasse 19, B-1050 Brussels

Please note that places for the workshop are limited and registration is subject to confirmation.

  
    Background     
    Consultation Documents     
    Public Responses     
    Public Workshop     
Draft Pilot Framework Guideline on Gas Capacity Allocation on European Gas Transmission NetworksDraft Pilot Framework Guideline on Gas Capacity Allocation on European Gas Transmission Networks   

Upon a request from the European Commission, ERGEG is using the so-called interim period until the Agency for Cooperation of Energy Regulators (ACER) becomes fully operational to simulate the development of framework guidelines according to the provisions of the 3rd Package. ERGEG has therefore developed a draft pilot framework guideline on capacity allocation in gas transmission networks, which covers cross-border interconnection points between two or more Member States as well as interconnections between adjacent entry-exit-systems within the same Member State, insofar as the points are subject to booking procedures by users.

ERGEG invited all stakeholders to participate in its consultation on the draft pilot framework guideline.
All comments should be submitted by Friday, 26 February 2010 and should be sent by email to: fg_pilot_gas@ergeg.org.

Following the Conclusions of the 17th Madrid Forum, stakeholders were invited to send their comments to the ERGEG document on recommendations for guidelines on congestion management. This document is intended to serve as input for the Commission when revising the Annex of Regulation (EC) 1775/2005 regarding the rules on congestion management. The deadline for submitting comments was 31 March 2010

ERGEG  evaluated the comments received from stakeholders and revised the Recommendations on CMP

Any questions on these documents should in the first instance be directed to:

Mrs. Fay Geitona
CEER Secretary General
Email: fay.geitona@ceer.eu
Tel. +32 2 788 73 30
Fax +32 2 788 73 50

 




 
       
Documents under Public Consultation  
2.1. Custom File 
Pilot Framework Guideline on capacity allocation mechanismPilot Framework Guideline on capacity allocation mechanism   
Adobe Portable Document Format  Ref. E09-GNM-10-05
Pilot framework guideline on CAM - initial impact assessmentPilot framework guideline on CAM - initial impact assessment   
Adobe Portable Document Format  Ref. E09-GNM-10-06
Instructions how to respond to the public consultationInstructions how to respond to the public consultation   
Adobe Portable Document Format  Ref. E09-GNM-10-05a
DOWNLOAD ALL FILES