login
calendarsearchsitemaplost passwordregister
 
 
 
 
 
   OPEN PUBLIC CONSULTATIONS
   CLOSED PUBLIC CONSULTATIONS
     GAS
       Pilot Framework Guideline Gas CAM / CMP
       10-year gas network development plan
       ERGEG Principles: CAM and CMP for Gas
       Article 22 - Exemptions to TPA
       GGPLNG
       Principles gas tariff calculation
       Gas Transparency Monitoring
       Capacity Calculation
       GRI Convergence
       Secondary Markets
       GGP Open Season
       Transmission Pricing
       GGP Balancing 2006
       Monitoring GGPSSO
       Roadmap to competitive markets
       GGP Balancing 2005
       GGP for Storage System Operators
     ELECTRICITY
     CROSS-SECTORAL
     CUSTOMERS
E09-PC-46: Draft Pilot Framework Guideline on Capacity Allocation on European Gas Transmission Networks   
ERGEG Public Consultation: 2009/12/18-2010/02/26 

 

ERGEG Workshop :  2  February 2010 from 10:30 to 16:30 hours
Renaissance Brussels Hotel 
located at:  rue du Parnasse 19, B-1050 Brussels

Please note that places for the workshop are limited and registration is subject to confirmation.

  
    Background     
    Consultation Documents     
    Responses Received     
    Public Workshop     
Draft Pilot Framework Guideline on Gas Capacity Allocation on European Gas Transmission NetworksDraft Pilot Framework Guideline on Gas Capacity Allocation on European Gas Transmission Networks   

Upon a request from the European Commission, ERGEG is using the so-called interim period until the Agency for Cooperation of Energy Regulators (ACER) becomes fully operational to simulate the development of framework guidelines according to the provisions of the 3rd Package. ERGEG has therefore developed a draft pilot framework guideline on capacity allocation in gas transmission networks, which covers cross-border interconnection points between two or more Member States as well as interconnections between adjacent entry-exit-systems within the same Member State, insofar as the points are subject to booking procedures by users.

ERGEG invites all stakeholders to participate in its consultation on the draft pilot framework guideline.
All comments should be submitted by Friday, 26 February 2010 and should be sent by email to: fg_pilot_gas@ergeg.org.

Following the Conclusions of the 17th Madrid Forum, stakeholders are invited to send their comments to the ERGEG document on recommendations for guidelines on congestion management. This document is intended to serve as input for the Commission when revising the Annex of Regulation (EC) 1775/2005 regarding the rules on congestion management. The deadline for submitting comments is 31 March 2010.

 

Following the public consultation period, ERGEG will publish all comments received from stakeholders. If a respondent would like ERGEG to treat their contribution with confidentiality then this must be explicitly mentioned in their submission.

Any questions on these documents should in the first instance be directed to:

Mrs. Fay Geitona
CEER Secretary General
Email: fay.geitona@ceer.eu
Tel. +32 2 788 73 30
Fax +32 2 788 73 50




 
       
DOWNLOAD ALL FILES