Home
Home
login
calendarsearchsitemaplost passwordregister
ABOUTACTIVITIESEVENTSINTERNATIONALPUBLICATIONS & PRESSPUBLIC CONSULTATIONS
 
ENERGY CUSTOMERSSURVEYS
 
 
 
 
   OPEN PUBLIC CONSULTATIONS
   CLOSED PUBLIC CONSULTATIONS
     CUSTOMERS
     ELECTRICITY
       Non-harmonised RES
       ERI Benchmarking report
       Draft FG on CACM for Elec.
       Comitology Guideline Elec. Trans.
       Pilot FG on Elec. Grid Connection
       Electricity Generation Adequacy
       Elec. cross-border trade incentives
       Smart Grids
       Elec. 10-year network dev. plan
       Integration of Wind Generation
       GGP Elec. Grid connection & Access
       New GGP Balancing Mkts. Integration
       2008 Compliance Monitoring
       Treatment of Losses
       GGP Operational Security
       2008 ERI Coherence & Convergence
       2007 ERI Coherence & Convergence
       Voltage Quality
       CBF for infrastructure
       GGP Balancing
       Inter-TSO Compensation Guidelines
       GGP Transparency
       Congestion Mgtm. Guidelines
       Transmission Tarification Guidelines
     GAS
     CROSS-SECTORAL
E09-PC-45: ERGEG Draft Advice on the Community-wide Ten-year Electricity Network Development Plan  
ERGEG Public Consultation: 2009/12/17-2010/02/25

 

ERGEG Workshop :  11  February 2010 from 14:00 to 16:30 hours
Marriott Brussels Hotel 
located at:  rue Auguste Orts 3-7, B-1000 Brussels

Please note that places for the workshop are limited and registration is subject to confirmation.  

 

 

  
    Background     
    Consultation Documents     
    Public Responses     
    Stakeholder Workshop     
ERGEG Draft Advice on the Community-wide Ten-year Electricity Network Development PlanERGEG Draft Advice on the Community-wide Ten-year Electricity Network Development Plan  

Regulation (EC) 714/2009  (Electricity Regulation) requires that the European Network of Transmission System Operators for Electricity (ENTSO-E) adapt and publish a non-binding Community-wide ten-year electricity network development plan every two years. This document sets out ERGEG’s draft advice for the development of the Community-wide ten-year development plan, in accordance with the legislative requirements, as guidance for ENTSO-E’s work in this area during the interim period. ERGEG will use this document when giving its duly reasoned opinion on ENTSO-E’s draft Community-wide ten-year network development plan.

CEER invites all stakeholders interested in network planning issues to respond to this consultation, both in general and in relation to the questions in Section 1.2 of the report.

Interested parties are invited to submit comments by 25 February 2010 and these should be sent by e-mail to:  electricity_network_planning@ergeg.org.

Following the end of the public consultation period, ERGEG will publish all comments and replies to questions received from stakeholders.  If a respondent would like ERGEG to treat their contribution with confidentiality then this must be explicitly mentioned in their reply. If possible, confidential information should be provided as a separate annex, so that the main document may be published. Unless marked as confidential, all responses will be published by placing them on the ERGEG website: http://www.energy-regulators.eu.  

Any questions relating to this document should in the first instance be directed to:

Mrs. Fay Geitona
CEER Secretary General
Email: fay.geitona@ceer.eu
Fax +32 2 788 73 50
Tel. +32 2 788 73 30




 
       
DOWNLOAD ALL FILES