login
calendarsearchsitemaplost passwordregister
 
 
 
 
 
   OPEN PUBLIC CONSULTATIONS
   CLOSED PUBLIC CONSULTATIONS
     GAS
     ELECTRICITY
       Non-harmonised RES
       ERI Benchmarking report
       Draft FG on CACM for Elec.
       Comitology Guideline Elec. Trans.
       Pilot FG on Elec. Grid Connection
       Electricity Generation Adequacy
       Elec. cross-border trade incentives
       Smart Grids
       Elec. 10-year network dev. plan
       Integration of Wind Generation
       GGP Elec. Grid connection & Access
       New GGP Balancing Mkts. Integration
       2008 Compliance Monitoring
       Treatment of Losses
       GGP Operational Security
       2008 ERI Coherence & Convergence
       2007 ERI Coherence & Convergence
       Voltage Quality
       CBF for infrastructure
       GGP Balancing
       Inter-TSO Compensation Guidelines
       GGP Transparency
       Congestion Mgtm. Guidelines
       Transmission Tarification Guidelines
     CROSS-SECTORAL
     CUSTOMERS
E10-PC-52: Pilot Framework Guidelines on Electricity Grid Connection   
2010/07/14 - 2010/09/24

  
    Background     
    Consultation Documents     
    Public Responses     
    Public Hearings     
Pilot Framework Guidelines on Electricity Grid ConnectionPilot Framework Guidelines on Electricity Grid Connection   

At the heart of the 3rd Legislative Package is the development of EU-wide network codes on topic areas for the integration of EU electricity and gas markets, enabling cross-border trade and competition to develop across EU energy markets. Upon a request from the European Commission, ERGEG is using the so-called interim period until the Agency for Cooperation of Energy Regulators (ACER) becomes fully operational to simulate the development of framework guidelines according to the provisions of the 3rd Package. ERGEG has therefore developed draft pilot framework guideline on electricity grid connection. This draft is accompanied by an initial impact assessment.

Grid connection covers all issues to establish and to maintain a physical connection between the transmission and / or distribution grid and the grid customers. Grid connection is used here as a synonym for network connection, which is the area for a network code according to Article 8.1.b of the Regulation (EC) 714/2009. In the context of this Initial Impact Assessment (IIA), grid connection requirements are considered as features and rules which the transmission and distribution grid operators, as well as the grid users have to meet, in order to maintain system security, availability and the proper functioning of the electricity market from a technical point of view.

ERGEG invites all interested parties to provide comments to the consultation paper (framework guidelines) – and in particular the 9 questions in the accompanying cover note. Any comments should be received by 24 September 2010 and should be sent by email to fg_pilot_electricity@ergeg.org.

Following the public consultation period, ERGEG will publish all comments received from stakeholders. If a respondent would like ERGEG to treat their contribution with confidentiality then this must be explicitly mentioned in their submission.

Any questions on these documents should in the first instance be directed to:

Mrs. Fay Geitona
CEER Secretary General
Email: fay.geitona@ceer.eu
Tel. +32 2 788 73 30
Fax +32 2 788 73 50




 
       
DOWNLOAD ALL FILES